流水槽模具在铺设上 |
添加时间:2022/12/21 14:47:07 浏览次数: |
流水槽模具在铺设上一般是从下游开始,使接头面向上游。每节预制水渠模应紧贴于底部,使流水槽模具受力均匀,不会倾倒。在铺设之前我们都会设立中轴线,预制流水槽模具都应该按正确的轴线铺设。 The flume die is usually laid downstream to make the joint face upstream. Each prefabricated channel die should be close to the bottom, so that the force of the flume die is uniform, and it will not collapse. Before laying, we will set up the central axis. The prefabricated flume moulds should be laid according to the correct axis. 铺设时各个模具的壁厚应该整齐。相邻水渠白钢雕塑 小型滚揉机 防火电缆 托辊设备 水刀切割机 铜钟 石雕狮子 校园不锈钢雕塑 扭王块模具应预留少于两毫米的宽度,然后使用水泥浆勾缝,勾缝应平顺密实,勾缝深度不得小于水渠的厚度,这样做的目的是使其整体稳固、不漏水。 When laying, the wall thickness of each die should be neat. Neighbouring canals should be reserved less than two millimeters in width, and then cement slurry joints should be used. The joints should be smooth and compact, and the depth of joints should not be less than the thickness of the canal. The purpose of this is to make the whole stable and water-tight |
上一页 没有了 |
下一页 护坡模具应贮存于常温干燥库中 |
一键拨号:15830953777